Schedule

This figure includes each step along the way of designing the entire project. It begins with the proposal, then outlines the construction and building of the R/C car and is finished with the testing of the car. The design schedule includes each part of the report and design processes. The duration that each aspect will occur has been estimated and started.

​

Gantt chart.png
Winter schedule.png
Spring schedule 2.png

Budget

Part suppliers included: RC Mart, Hobbywing, and Amazon for most of the components for the RC car. Some components such as the leaf springs for the rear suspension,were sourced from previous projects.The material used to make the chassis, suspension tower and the a arms were donated from the Hogue machine shop.

​

​

​

​

​

​

​

​

Budget chart.png